Construction and Management of Pesticide GLP Laboratory
-
Graphical Abstract
-
Abstract
This paper introduced the development of GLP and assessment requirements of GLP laboratory.The idea of GLP runs through nine aspects of laboratory construction and management,from the organization and personnel,facilities,environmental conditions,and so on.This paper discussed respectively the construction key points and the management method of the GLP laboratory.For regulating the testing work of pesticide testing results effectively,also guarantying the reliability,integrity and repeatability of the test results,it should widely implement and construct GLP in the field of pesticide detection,and gradually narrow the gap with foreign GLP laboratories.
-
-